Electrical Permits & Inspections
The City of Sumner does not conduct its own electrical permits and inspections. For more information, visit the Department of Labor & Industries. þ
Prior to construction or remodeling, food service establishments must submit detailed design plans and equipment specifications for approval by the Tacoma-Pierce County Health Department. þ This assists establishments by ensuring compliance with Code requirements. Once construction is complete, an inspection is conducted to verify that all design and installation requirements have been met.
Å 253-798-6460
You need a building permit from the City if you are installing a mobile/manufactured home on a site in Sumner. However, the
Department of Labor & Industries has jurisdiction on Mobile/Manufactured home alterations, including
-
Heat pump/air conditioning installations
-
Wood/pellet/gas stove installations
-
Changing from electric to gas appliances
-
Electrical or plumbing changes
-
Structural changes or additions.
More Details at Department of Labor and Industries þ
Å 206-835-1111
Public Pools & Water Recreation Facilities
Prior to construction or
remodeling, water recreation facilities (including
spa pools) must submit detailed design plans and
equipment specifications for approval by
Tacoma-Pierce County Health Department.
þ
This assists establishments
by ensuring compliance with Code requirements. Once
construction is complete, an inspection is conducted
to verify that all design and installation
requirements have been met.
Å 253-798-6460
Washington Association of Building Officials (WABO) is an organization comprised of Building Officials throughout the state of Washington. Registered Special Inspection agencies are listed at this web site. Code books are also available at WABO. þ
Å 360-586-6725.


